Skip to content
New Construction · Boyds Creek, TN

Mapped Out Before The Slab Gets Poured

For families building a house on land that used to be farmed. We sit down with the plans early, decide where the meter and panel land relative to the drive and the house, route the underground service across the parcel, and draw the well pump, septic pump, garage and shop circuits in from the start. Then we walk the rough-in with you before a single sheet of drywall goes up.

Plans on the table

Where the power comes in decides half the house.

A new house on an open parcel has no old wiring to work around, which sounds easy until you count how many choices are still loose. Where does the service enter? How far is the panel from the kitchen, the laundry and the garage? Will the well pump get a circuit sized for what it actually draws? Most of those answers cost little on paper and a lot once the walls are closed, so we like to settle them while the house is still lines on a site plan.

Every foot between the meter and the panel, and between the panel and a far outbuilding, is a foot of conductor we size for voltage drop as well as amperage.

Meter and panel placement on a wide-open lot

On a former farm parcel the house often sits a long way back from the road. That leaves room to put the meter almost anywhere, and that freedom is where mistakes happen. A meter tucked behind a corner can end up hidden by a future deck, and a panel placed by habit on the far side of the house adds length to nearly every circuit. We look at the drive, the garage door, the side of the house the utility can reach, and where you will want to stand when a breaker trips at night. Most of the time the panel lands in the garage or a utility room close to the meter, with clear space in front of it that nobody will later fill with shelving.

The long underground run across the parcel

When a house sits well off the road, the service usually reaches it underground. The utility sets its own requirements for where the meter and its equipment go, and we plan the trench from there: a route that stays clear of the well, the septic field if there is one, and the strip the builder wants for the driveway. Conductor size is set by distance as much as by load, because a long run with undersized wire leaves the house with sagging voltage every time something big starts. We time the trench with your builder so it is open, inspected and backfilled before the yard gets graded.

Well pump and septic pump circuits drawn in on day one

Many houses here run on a well, and some lots also carry a septic system with a pump and an alarm. Both belong in the electrical plan from the first sketch: dedicated circuits, a disconnect where one is required, and pump controls mounted where you can reach them. If a whole-home Generac standby unit is in your future, we decide now which circuits the transfer switch will carry, because a house that loses its well pump in an outage also loses water. As a certified Generac installer we can rough in for the generator while the house is framed and leave the unit itself for later.

Garage, shop and outbuilding feeds before the concrete

Concrete is the deadline. Anything that has to pass under a slab, a garage floor or a shop pad needs to be in place before the pour, and a missing conduit there means saw cuts or an awkward surface run later. We ask what the garage and any outbuilding will hold: a welder, an air compressor, a chest freezer, a car lift, a future EV charger. Then we size the feed, set the sleeves and conduit under the slab, and decide whether the shop runs from a sub-panel off the house or needs something larger. A spare empty conduit laid during this stage is about the cheapest thing on the whole job.

The rough-in walkthrough, with you in the room

Once the boxes are set and the wire is pulled, and before insulation goes in, we walk the house with you. Bring the furniture plan in your head: where the bed goes, where the TV hangs, which side of the island gets the stools. Outlets get moved, a switch gets added by the back door, a fan box appears in the porch ceiling. Changes at this stage take minutes.

Sevier County permits, in the order they happen

The electrical permit goes through Sevier County’s building department, and we schedule each inspection as the work reaches that stage. Trenches and the underground service get looked at before backfill, the rough-in is inspected before the walls close, and the final comes once the fixtures, devices and panel are finished. We coordinate each inspection visit and keep your builder posted, so nobody pours, insulates or hangs drywall ahead of a sign-off.

It starts with the plans, even rough ones. Send the site plan and the floor plan, tell us what the outbuildings are for, and we will come walk the lot. You get a free quote that lists the service size, the underground run, the well and septic circuits, the shop feed and the permit, so you can line it up item by item against what your builder has budgeted.

new gray load center mounted on a raw wood plank wall, door open with the label sheet, breakers in two neat columns, cable dressed straight down each side, yellow and orange wire nuts on the pigtails at the bottom
Connected work

What the new house will lean on after move-in.

A new build is the easiest time to plan for the work that usually shows up later. Once you are living there and want a circuit added in the shop or another outlet on the porch, that falls under everyday residential electrical in Boyds Creek. The stairwell and foyer fixtures in a two-story plan get their own conversation under custom lighting for stairs and entries. A brand new panel is the simplest place to add whole-home surge protection, and if something quits after the final inspection, electrical troubleshooting in Boyds Creek is where we start.

Our new construction electrical page covers new builds across the rest of our area, the Boyds Creek page lists the other work we take on there, and the gallery shows finished panels and fixtures. When the drawings are ready, send them over with a few notes on the lot.

We handle every permit for this work with Sevier County ourselves, so the builder never waits on our paperwork.

New Construction · Boyds Creek, TN · FAQ

Before the first load of lumber shows up.

Can you look at our plans before the builder breaks ground?
Yes, and that is the best time for it. With the site plan and floor plan in front of us we can place the meter and panel, plan the underground route and list every dedicated circuit the house needs. Changes on paper cost nothing. The same changes after framing cost time, and after drywall they cost more.
Does a well pump need its own circuit?
Yes. A well pump gets a dedicated circuit sized for its motor, with the pressure switch and any control box wired so the pump can be shut off safely for service. If a standby generator is part of the plan, we make sure the well pump is on the list of circuits the transfer switch carries.
Where should the panel go in a new house?
Usually in the garage or a utility room near the meter, where the feed from outside stays short and the space in front of the panel stays clear. We also weigh how far the kitchen, the laundry and any shop sit from it, since a central panel keeps most circuit runs shorter.
What has to be done before the garage slab is poured?
Any conduit or sleeve that passes under the slab: feeds to a shop or detached garage, a future EV charger spot, an island outlet or a floor box. Once the concrete is down, adding those means cutting the floor or running pipe on the surface. We set them at the underground stage and get them inspected first.
Who decides where the meter goes on a new house?
The utility has the final say on meter location and how service reaches the house, and the inspector checks our side of the work. We start from the utility’s requirements, then place the meter base and panel to suit the drive, the garage and the way you plan to use the house.
How are the septic pump and alarm wired on a new house?
If the lot has a septic system with a pump, the pump and the alarm each get their own circuit, so a tripped pump breaker cannot silence the warning. The control panel goes where you can see and hear it, with a disconnect close by where one is required. We run its conduit to the tank along with the rest of the underground work.
Plans, lot, outbuildings

Show us the lot and the drawings.

Send the site plan, the floor plan and a short list of what the garage and any outbuilding will hold. We look it over, walk the parcel, and put together a free quote for the full electrical package. Send the plans here, or call and describe the lot.